Fire Tech Productions - OnLine Training
 Sprinkler LIII Online Courses Back to Homepage 
  Lessons
Introduction to NICET
Intro to NICET - Test Day Tips & Hints
15001 - Post-Test - Project Scheduling and Coordination
15002/15003 - Bid Invitations and Proposals, and Contractual Requirements
15002/15003 - Post-Test - Bid Invitations and Proposals, and Contractual Requirements
15005 - Shop and Erection Drawings
15005 - Post-Test - Shop and Erection Drawings
15007 - System Acceptance Tests
15007 - Post-Test - System Acceptance Tests
15007 - System Acceptance Tests - Addendum for Solutions
15008 - Anti-Freeze Systems
15008 - Post-Test - Anti-Freeze Systems
15009 - Water Cooling Towers
15001 - Project Scheduling and Coordination
15009 - Post-Test - Water Cooling Towers
15010 - Aircraft Hangers
15010 - Post-Test - Aircraft Hangers
15011 - Internal and External Corrosion
15011 - Post-Test - Internal and External Corrosion
15012 - Meters and Backflow Prevention
15012 - Post-Test - Meters and Backflow Prevention
15013 - Land Surveying
15013 - Post-Test - Land Surveying
15014 - Advanced Hydraulic Calculations - Part I
15014 - Advanced Hydraulic Calculations - Part II
15014 - Post-Test - Advanced Hydraulic Calculations
15014 - Addendum for Solutions to Problems
15016 - Hydraulic Design Area
15016 - Post-Test - Hydraulic Design Area
16001 - Multi-Purpose Piping
16001 - Post-Test - Multi-Purpose Piping
16002 - Water Spray Systems - Part I
16002 - Water Spray Systems - Part II
16002 - Post-Test - Water Spray Systems
16003/16008/42002/53011 - Foam Systems, Foam-Water Systems, Foam-Water System Components, Foam Water I - Part I
16003/16008/42002/53011 - Foam Systems, Foam-Water Systems, Foam-Water System Components, Foam Water I - Part II
16003, 16008, 42002, 53011 - Foam Systems - Post-Test
16004 - Halon Systems
16004 - Post-Test - Halon Systems
16004 - Halon Systems - Addendum for Solutions
16005, 53012 - Carbon Dioxide
16005, 53012 - Carbon Dioxide - Post Test
16006 - Alarm and Supervisory Systems - Part I
16006 - Alarm and Supervisory Systems - Part II
16006 - Post-Test - Alarm and Supervisory Systems
16007, 54008 - Dry Chemical Systems/Dry Chemical I
16007, 54008 - Post-Test - Dry Chemical Systems/Dry Chemical I
16009 - Sprinklers and Valves
16009 - Post-Test - Sprinklers and Valves
16010 - Large Drop Sprinkler System
16010 - Post-Test - Large Drop Sprinkler System
    Reference Material
 FAQs  Glossary
 Digital Library
    Communication
 Bulletin Board  Calendar
 Messages  Chat
Cost: $199 for 90 day (24 x 7) access to this online course. This course covers 23 Level III elements from Automatic Sprinklers and Introduction to NICET. This package contains a presentation with a corresponding test which covers each element. This will help you practice and prepare for NICET testing in Fire Alarms. The following Level III elements will be covered: Level III elements: 15001, 15002/15003, 15005, 15007, 15008, 15009, 15010, 15011, 15012, 15013, 15014, 15016, 16001, 16002, 16003, 16004, 16005, 16006, 16007, 16008, 16009, and 16010.



You need to complete all the lessons in order to receive a completion certificate.

This course must be completed within 90 days of enrollment.

Learner Notes
You can take notes while you browse lessons. Notes will be displayed here.
Copyright - Fire Tech Productions, Inc. 2008. Unauthorized use and reproduction of this material is prohibited.
My Home | Help & Support 
Powered by Mindflash Tech (tm).